Civil Engineer in Site:


1) Follow safety Instructions to foreman, Supervisor, Labour etc.,
2) Arrange Manpower to work for Engaging all in site.
3) Verify the safety checklist with safety officer in hot , heights , Earth work, material movement places.
4) Verify done and on going Work as per record and drawings.
5) Material Calculation and Check Material availability , Incase have demand before starting the work to intimate purchase department to arrange in site.
6)Ready Bar Bending Schedule to give Bar Bender Foreman.
7)To ready work schedule and daily manpower schedule.
8)If any changes in drawing to intimate client and official person in deciding authority in company to getting Approval.To change the changes in soft copy.
9) Before Concreting getting Aproval form client consultant
10)In Concreting Time to check Pump Placing height, compaction, leveling, Water ratio, slump cone Test, temperature test, casting cubes based on quantity.